Resources

Procurement guidance for
better fastener RFQs.

These resources explain how to structure requirements. They do not replace the governing standard, engineering review or supplier-specific capability confirmation.

Guide 05

Control custom drawing revisions

Issue one clear revision for quotation and ensure subsequent changes are recorded before sample or production approval.

  • Use consistent units
  • Mark critical characteristics
  • Reference test and inspection methods
Guide 06

Compare quotations on the same basis

Check that each offer addresses the same specification, documentation, packaging, logistics assumption and acceptance scope.

  • Record proposed deviations
  • Confirm the quoted manufacturing source
  • Resolve ambiguous documentation language

Start with the specification

Send a clearer RFQ.
Build a more reliable supply plan.

Describe the standard or drawing requirements, material, grade, size, finish, quantity and documentation needs available today.

Request a quote
Request a quote